Run mix setup and capture the baseline mix precommit result #55

Closed
opened 2026-09-26 13:58:53 +00:00 by belvedere · 1 comment
Collaborator

Objective: Prove the untouched scaffold is green before any work starts, so later failures
are attributable.

Files:

  • Modify: none (record output in the issue or docs/)

Steps:

  1. mix setup (deps.get, ecto.setup, assets.setup, assets.build).
  2. mix precommit — the alias runs compile --warning-as-errors,
    deps.unlock --unused, format, test.
  3. Paste the tail of the output into this issue.

Verify: mix precommit exits 0. If it does not, fix the environment (not the code) and
note what was wrong.

Refs: AGENTS.md — "Use mix precommit alias when you are done with all changes"

**Objective:** Prove the untouched scaffold is green before any work starts, so later failures are attributable. **Files:** - Modify: none (record output in the issue or `docs/`) **Steps:** 1. `mix setup` (deps.get, ecto.setup, assets.setup, assets.build). 2. `mix precommit` — the alias runs `compile --warning-as-errors`, `deps.unlock --unused`, `format`, `test`. 3. Paste the tail of the output into this issue. **Verify:** `mix precommit` exits 0. If it does not, fix the environment (not the code) and note what was wrong. **Refs:** AGENTS.md — "Use `mix precommit` alias when you are done with all changes"
Author
Collaborator

Duplicate of #3 — created by a re-run whose pagination helper only saw the first page of issues. Closing to keep the backlog clean. Repo owner can delete this outright.

Duplicate of #3 — created by a re-run whose pagination helper only saw the first page of issues. Closing to keep the backlog clean. Repo owner can delete this outright.
Sign in to join this conversation.
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
nickkeers/first-thousand-words#55
No description provided.